Novarly ParcelRenewable sites

Renewable sitesDartmoor Bio Power

Dartmoor Bio Power

Dartmoor Bio Power is operational in South Hams with a recorded capacity of 3.9 MW, and has been generating since 2013-11-06.

3.9 MW
Capacity
as recorded in REPD
Operational
Status
since 2013-11-06
Advanced Conversion Technologies
Technology
Dartmoor Bio Power 1
South Hams
Authority
England

Planning and build timeline

Application submitted2008-01-21
Permission grantednot recorded
Operational2013-11-06

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Derriford Hospital
Biomass (dedicated) · Operational
1.53.9 km
Warleigh Barton Solar Farm
Solar Photovoltaics · Operational
54 km
Ernesettle Solar Farm
Solar Photovoltaics · Operational
4.16.6 km
Lee Moor China Clay Works
Solar Photovoltaics · Operational
9.57.1 km
North Wayton Farm
Solar Photovoltaics · Operational
57.5 km
Newnham Estate
Solar Photovoltaics · Operational
147.6 km
North Yard EfW
EfW Incineration · Operational
22.57.9 km
Chelson Meadow 2
Landfill Gas · Operational
1.49 km

How big is Dartmoor Bio Power?

Dartmoor Bio Power has a recorded installed capacity of 3.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Dartmoor Bio Power?

REPD records the operator as Dartmoor Bio Power 1. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Dartmoor Bio Power approved and built?

The application was submitted on 2008-01-21. REPD does not record a grant date. The site became operational on 2013-11-06.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6442.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council