Land at Tangmere Airfield

Land at Tangmere Airfield is operational in Chichester with a recorded capacity of 5 MW, and has been generating since 2015-10-07.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-10-07
Solar Photovoltaics
Technology
West Sussex County Council
Chichester
Authority
England

Planning and build timeline

Application submitted2014-11-13
Permission granted2015-01-01
2 months after submission
Operational2015-10-07
9 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Chichester’s record on solar

Chichester has decided 24 solar farms and approved 88%, taking a median of 2.6 months. See every solar farm decision in Chichester

Other built sites within 15 km

SiteMWDistance
Oving Solar Farm
Solar Photovoltaics · Operational
51.2 km
Strettington Solar Farm
Solar Photovoltaics · Operational
52.2 km
Decoy Farm House Solar Modules
Solar Photovoltaics · Operational
62.2 km
Former Westhampnett Landfill
Solar Photovoltaics · Operational
7.52.9 km
Lidsey Landfill
Landfill Gas · Operational
1.43.2 km
Manor Farm - Shripney
Solar Photovoltaics · Operational
53.9 km
Merston Solar Park
Solar Photovoltaics · Operational
103.9 km
Donaldsons Nursery, Marsh Farm - Solar Panels
Solar Photovoltaics · Under Construction
0.194.4 km

How big is Land at Tangmere Airfield?

Land at Tangmere Airfield has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Land at Tangmere Airfield?

REPD records the operator as West Sussex County Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Land at Tangmere Airfield approved and built?

The application was submitted on 2014-11-13. Permission was granted on 2015-01-01, 2 months later. The site became operational on 2015-10-07, 9 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4766.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council