Lee Moor China Clay Works

Lee Moor China Clay Works is operational in South Hams with a recorded capacity of 9.5 MW, and has been generating since 2015-12-15.

9.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-12-15
Solar Photovoltaics
Technology
Wanageeska
South Hams
Authority
England

Planning and build timeline

Application submitted2014-08-06
Permission granted2014-10-27
3 months after submission
Operational2015-12-15
14 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 5 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

South Hams’s record on solar

South Hams has decided 27 solar farms and approved 93%, taking a median of 3.3 months. See every solar farm decision in South Hams

Other built sites within 15 km

SiteMWDistance
Newnham Estate
Solar Photovoltaics · Operational
144.5 km
Langage Solar Farm
Solar Photovoltaics · Operational
56.5 km
Dartmoor Bio Power
Advanced Conversion Technologies · Operational
3.97.1 km
Derriford Hospital
Biomass (dedicated) · Operational
1.57.9 km
Warleigh Barton Solar Farm
Solar Photovoltaics · Operational
510.7 km
Luson Farm
Solar Photovoltaics · Operational
1.910.8 km
Balls Wood Solar Farm
Solar Photovoltaics · Operational
8.711 km
Chelson Meadow 2
Landfill Gas · Operational
1.411.2 km

How big is Lee Moor China Clay Works?

Lee Moor China Clay Works has a recorded installed capacity of 9.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Lee Moor China Clay Works?

REPD records the operator as Wanageeska. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Lee Moor China Clay Works approved and built?

The application was submitted on 2014-08-06. Permission was granted on 2014-10-27, 3 months later. The site became operational on 2015-12-15, 14 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4839.