Cruachan

Cruachan is an operational 440 MW pumped storage scheme in Argyll and Bute, generating since 1 January 1966. REPD does not record the planning grant date. Operator of record: Drax (formerly Scottish Power).

440 MW
Capacity
as recorded in REPD
Operational
Status
since 1 January 1966
Pumped Storage Hydroelectricity
Technology
Drax (formerly Scottish Power)
Argyll and Bute
Authority
Scotland

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational1 January 1966

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Argyll and Bute: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Cruachan’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Small Hydro · Under Construction
26.3 km
Small Hydro · Under Construction
0.48.5 km
Small Hydro · Operational
111.5 km
Small Hydro · Operational
1.511.7 km
Small Hydro · Operational
211.8 km
Wind Onshore · Operational
7.811.8 km
Wind Onshore · Operational
4613.8 km

How big is Cruachan?

Cruachan has a recorded installed capacity of 440 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Cruachan?

REPD records the operator as Drax (formerly Scottish Power). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Cruachan approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1 January 1966.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6841.