Novarly ParcelRenewable sites

Renewable sitesGlen Noe River

Glen Noe River

Glen Noe River is a 2 MW hydro scheme under construction in Argyll and Bute. Planning permission was granted on 9 September 2016, 9 months after submission. Operator of record: RWE Npower Renewables / Innogy.

2 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Small Hydro
Technology
RWE Npower Renewables / Innogy
Argyll and Bute
Authority
Scotland

Planning and build timeline

Application submitted14 December 2015
Permission granted9 September 2016
9 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Argyll and Bute: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Glen Noe River’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Pumped Storage Hydroelectricity · Operational
4406.3 km
Small Hydro · Operational
111 km
Wind Onshore · Operational
7.811.7 km
Small Hydro · Under Construction
0.413.1 km

How big is Glen Noe River?

Glen Noe River has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Glen Noe River?

REPD records the operator as RWE Npower Renewables / Innogy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Glen Noe River approved and built?

The application was submitted on 14 December 2015. Permission was granted on 9 September 2016, 9 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5962.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode