Glen Noe River
Glen Noe River is under construction in Argyll and Bute with a recorded capacity of 2 MW.
Planning and build timeline
| Application submitted | 2015-12-14 |
| Permission granted | 2016-09-09 9 months after submission |
| Operational | not recorded |
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Cruachan Pumped Storage Hydroelectricity · Operational | 440 | 6.3 km |
Glen Kinglass Small Hydro · Operational | 1 | 11 km |
Beinn Ghlas Wind Farm Wind Onshore · Operational | 7.8 | 11.7 km |
Craig Farm Small Hydro · Under Construction | 0.4 | 13.1 km |
How big is Glen Noe River?
Glen Noe River has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Glen Noe River?
REPD records the operator as RWE Npower Renewables / Innogy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Glen Noe River approved and built?
The application was submitted on 2015-12-14. Permission was granted on 2016-09-09, 9 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5962.