Beinn Ghlas Wind Farm

Beinn Ghlas Wind Farm is an operational 7.8 MW onshore wind farm in Argyll and Bute, generating since 25 June 1999. Planning permission was granted on 21 August 1998, 15 months after submission. Operator of record: RWE npower.

7.8 MW
Capacity
as recorded in REPD
Operational
Status
since 25 June 1999
Wind Onshore
Technology
RWE npower
Argyll and Bute
Authority
Scotland

Planning and build timeline

Application submitted7 May 1997
Permission granted21 August 1998
15 months after submission
Operational25 June 1999
10 months after consent

Screening a site of your own?

RedlineUK · £39

Argyll and Bute approves 58% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Beinn Ghlas Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Argyll and Bute’s record on onshore wind

Argyll and Bute has decided 38 onshore wind schemes and approved 58%, taking a median of 14.7 months. See every onshore wind scheme decision in Argyll and Bute

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
464.8 km
Small Hydro · Under Construction
211.7 km
Pumped Storage Hydroelectricity · Operational
44011.8 km

How big is Beinn Ghlas Wind Farm?

Beinn Ghlas Wind Farm has a recorded installed capacity of 7.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Beinn Ghlas Wind Farm?

REPD records the operator as RWE npower. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Beinn Ghlas Wind Farm approved and built?

The application was submitted on 7 May 1997. Permission was granted on 21 August 1998, 15 months later. The site became operational on 25 June 1999, 10 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3295.