Renewable sites › Crockandun
Crockandun
Crockandun is an operational 15 MW onshore wind farm in Mid Ulster, generating since 9 March 2017. Planning permission was granted on 30 November 2012, 35 months after submission. Operator of record: Brookfield Renewable Energy Group.
Planning and build timeline
| Application submitted | 8 January 2010 |
| Permission granted | 30 November 2012 35 months after submission |
| Operational | 9 March 2017 51 months after consent |
Screening a site of your own?
Mid Ulster approves 85% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Crockandun’s recorded coordinate — swap in your own postcode or coordinates.
Mid Ulster’s record on onshore wind
Mid Ulster has decided 27 onshore wind schemes and approved 85%, taking a median of 21 months. See every onshore wind scheme decision in Mid Ulster →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 1 | 8.6 km |
Wind Onshore · Operational | 6 | 9 km |
Solar Photovoltaics · Operational | 4.9 | 9.8 km |
Anaerobic Digestion · Operational | 1 | 13.2 km |
How big is Crockandun?
Crockandun has a recorded installed capacity of 15 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Crockandun?
REPD records the operator as Brookfield Renewable Energy Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Crockandun approved and built?
The application was submitted on 8 January 2010. Permission was granted on 30 November 2012, 35 months later. The site became operational on 9 March 2017, 51 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4156.