Tullywiggan Road

Tullywiggan Road is an operational 1 MW anaerobic digestion plant in Mid Ulster, generating since 15 August 2014. Planning permission was granted on 16 May 2012, 11 months after submission. Operator of record: PAR Renewables.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 15 August 2014
Anaerobic Digestion
Technology
PAR Renewables
Mid Ulster
Authority
Northern Ireland

Planning and build timeline

Application submitted22 June 2011
Permission granted16 May 2012
11 months after submission
Operational15 August 2014
27 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Mid Ulster: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Tullywiggan Road’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
4.93.5 km
Battery · Under Construction
5012.9 km
Wind Onshore · Operational
1513.2 km
Wind Onshore · Operational
213.9 km

How big is Tullywiggan Road?

Tullywiggan Road has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Tullywiggan Road?

REPD records the operator as PAR Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Tullywiggan Road approved and built?

The application was submitted on 22 June 2011. Permission was granted on 16 May 2012, 11 months later. The site became operational on 15 August 2014, 27 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5673.