Novarly ParcelRenewable sites

Renewable sitesDraperstown (Brackagh) Wind Farm

Draperstown (Brackagh) Wind Farm

Draperstown (Brackagh) Wind Farm is operational in Mid Ulster with a recorded capacity of 6 MW, and has been generating since 2017-03-15.

6 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-03-15
Wind Onshore
Technology
Renewable Energy Generation (REG)
Mid Ulster
Authority
Northern Ireland

Planning and build timeline

Application submitted2009-02-09
Permission granted2010-06-28
17 months after submission
Operational2017-03-15
81 months after consent

Mid Ulster’s record on onshore wind

Mid Ulster has decided 27 onshore wind schemes and approved 85%, taking a median of 21 months. See every onshore wind scheme decision in Mid Ulster

Other built sites within 15 km

SiteMWDistance
Magherafelt
Wind Onshore · Operational
16.1 km
Crockandun
Wind Onshore · Operational
159 km
Brockaghboy Wind Farm - extension
Wind Onshore · Operational
1014.2 km

How big is Draperstown (Brackagh) Wind Farm?

Draperstown (Brackagh) Wind Farm has a recorded installed capacity of 6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Draperstown (Brackagh) Wind Farm?

REPD records the operator as Renewable Energy Generation (REG). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Draperstown (Brackagh) Wind Farm approved and built?

The application was submitted on 2009-02-09. Permission was granted on 2010-06-28, 17 months later. The site became operational on 2017-03-15, 81 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4361.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council