Renewable sites › Cowie Biomass Facility
Cowie Biomass Facility
Cowie Biomass Facility is operational in Stirling with a recorded capacity of 15 MW, and has been generating since 2008-02-01.
Planning and build timeline
| Application submitted | 2006-01-06 |
| Permission granted | 2006-07-27 7 months after submission |
| Operational | 2008-02-01 18 months after consent |
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Rosehill Wind Turbines Wind Onshore · Operational | 2.4 | 3.3 km |
Tod Hill Farm Wind Turbines Wind Onshore · Operational | 12 | 4.9 km |
Devilla Energy Storage Facility Battery · Under Construction | 500 | 7.9 km |
Merchiston Industrial Estate, Smith Street - Battery Storage Battery · Under Construction | 43 | 8.7 km |
Carrongrange Park - Hydro Powerhouse Small Hydro · Under Construction | — | 9 km |
CalaChem Fine Chemicals (Grangemouth) EfW Incineration · Under Construction | 21.5 | 10.8 km |
Craigengelt Wind Onshore · Operational | 20 | 11.8 km |
Balhearty Solar Solar Photovoltaics · Operational | 5 | 12 km |
How big is Cowie Biomass Facility?
Cowie Biomass Facility has a recorded installed capacity of 15 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Cowie Biomass Facility?
REPD records the operator as Norbord. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Cowie Biomass Facility approved and built?
The application was submitted on 2006-01-06. Permission was granted on 2006-07-27, 7 months later. The site became operational on 2008-02-01, 18 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 41.