Renewable sitesCalaChem Fine Chemicals (Grangemouth)

CalaChem Fine Chemicals (Grangemouth)

CalaChem Fine Chemicals (Grangemouth) is under construction in Falkirk with a recorded capacity of 21.5 MW.

21.5 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
EfW Incineration
Technology
Earls Gate Energy Centre
Falkirk
Authority
Scotland

Planning and build timeline

Application submitted2016-05-20
Permission granted2017-01-18
8 months after submission
Operationalnot recorded

Other built sites within 15 km

SiteMWDistance
Carrongrange Park - Hydro Powerhouse
Small Hydro · Under Construction
1.8 km
Merchiston Industrial Estate, Smith Street - Battery Storage
Battery · Under Construction
432.9 km
Avondale Quarry (Pilot)
Advanced Conversion Technologies · Operational
24.3 km
Rosehill Wind Turbines
Wind Onshore · Operational
2.47.5 km
Tod Hill Farm Wind Turbines
Wind Onshore · Operational
128.2 km
Cowie Biomass Facility
Biomass (dedicated) · Operational
1510.8 km
Burnhead
Wind Onshore · Operational
2611.3 km
Drumduff
Wind Onshore · Operational
8.512.2 km

How big is CalaChem Fine Chemicals (Grangemouth)?

CalaChem Fine Chemicals (Grangemouth) has a recorded installed capacity of 21.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates CalaChem Fine Chemicals (Grangemouth)?

REPD records the operator as Earls Gate Energy Centre. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was CalaChem Fine Chemicals (Grangemouth) approved and built?

The application was submitted on 2016-05-20. Permission was granted on 2017-01-18, 8 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5352.