Rosehill Wind Turbines
Rosehill Wind Turbines is an operational 2.4 MW onshore wind farm in Stirling, generating since 15 December 2015. Planning permission was granted on 24 April 2014, 18 months after submission. Operator of record: Green Cat Renewables.
Planning and build timeline
| Application submitted | 31 October 2012 |
| Permission granted | 24 April 2014 18 months after submission |
| Operational | 15 December 2015 20 months after consent |
Screening a site of your own?
Stirling approves 64% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Rosehill Wind Turbines’s recorded coordinate — swap in your own postcode or coordinates.
Stirling’s record on onshore wind
Stirling has decided 11 onshore wind schemes and approved 64%, taking a median of 14.4 months. See every onshore wind scheme decision in Stirling →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 12 | 3.3 km |
Biomass (dedicated) · Operational | 15 | 3.3 km |
Battery · Under Construction | 43 | 5.4 km |
Small Hydro · Under Construction | — | 5.7 km |
EfW Incineration · Under Construction | 21.5 | 7.5 km |
Battery · Under Construction | 500 | 8.9 km |
Advanced Conversion Technologies · Operational | 2 | 11.8 km |
Solar Photovoltaics · Operational | 5 | 12.2 km |
How big is Rosehill Wind Turbines?
Rosehill Wind Turbines has a recorded installed capacity of 2.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Rosehill Wind Turbines?
REPD records the operator as Green Cat Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Rosehill Wind Turbines approved and built?
The application was submitted on 31 October 2012. Permission was granted on 24 April 2014, 18 months later. The site became operational on 15 December 2015, 20 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3651.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode