Bellhouse South

Bellhouse South is operational in Colchester with a recorded capacity of 3.9 MW, and has been generating since 2004-05-01.

3.9 MW
Capacity
as recorded in REPD
Operational
Status
since 2004-05-01
Landfill Gas
Technology
Cory Environmental
Colchester
Authority
England

Planning and build timeline

Application submitted2000-06-22
Permission granted2000-09-22
3 months after submission
Operational2004-05-01
43 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Bellhouse Pit Landfill Scheme
Landfill Gas · Operational
2.71.4 km
Birch Solar Farm & Battery Storage
Battery · Operational
2.1 km
Birch Solar Farm & Battery Storage
Solar Photovoltaics · Operational
402.1 km
Layer Farm - Solar Farm
Solar Photovoltaics · Operational
492.3 km
Land Adjacent Claypits Farm (b) (Birch Estate)
Solar Photovoltaics · Operational
2.32.7 km
Land Adjacent Claypits Farm (a)
Solar Photovoltaics · Operational
52.9 km
Birch Airfield
Solar Photovoltaics · Operational
5.64.1 km
Colchester STW
Sewage Sludge Digestion · Operational
1.27.3 km

How big is Bellhouse South?

Bellhouse South has a recorded installed capacity of 3.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bellhouse South?

REPD records the operator as Cory Environmental. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bellhouse South approved and built?

The application was submitted on 2000-06-22. Permission was granted on 2000-09-22, 3 months later. The site became operational on 2004-05-01, 43 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 736.