Bellhouse Pit Landfill Scheme

Bellhouse Pit Landfill Scheme is operational in Colchester with a recorded capacity of 2.7 MW, and has been generating since 1999-01-15.

2.7 MW
Capacity
as recorded in REPD
Operational
Status
since 1999-01-15
Landfill Gas
Technology
Ex Waste Ltd/Combined Landfill Projects Ltd (CLP)
Colchester
Authority
England

Planning and build timeline

Application submitted1994-01-06
Permission granted1994-08-08
7 months after submission
Operational1999-01-15
53 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Bellhouse South
Landfill Gas · Operational
3.91.4 km
Birch Solar Farm & Battery Storage
Solar Photovoltaics · Operational
402.3 km
Birch Solar Farm & Battery Storage
Battery · Operational
2.3 km
Land Adjacent Claypits Farm (b) (Birch Estate)
Solar Photovoltaics · Operational
2.33.5 km
Layer Farm - Solar Farm
Solar Photovoltaics · Operational
493.6 km
Land Adjacent Claypits Farm (a)
Solar Photovoltaics · Operational
53.7 km
Birch Airfield
Solar Photovoltaics · Operational
5.64.8 km
Colchester STW
Sewage Sludge Digestion · Operational
1.27.8 km

How big is Bellhouse Pit Landfill Scheme?

Bellhouse Pit Landfill Scheme has a recorded installed capacity of 2.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bellhouse Pit Landfill Scheme?

REPD records the operator as Ex Waste Ltd/Combined Landfill Projects Ltd (CLP). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bellhouse Pit Landfill Scheme approved and built?

The application was submitted on 1994-01-06. Permission was granted on 1994-08-08, 7 months later. The site became operational on 1999-01-15, 53 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 505.