Renewable sitesAllt Garaidh Ghualaich Hydro Scheme Powerhouse

Allt Garaidh Ghualaich Hydro Scheme Powerhouse

Allt Garaidh Ghualaich Hydro Scheme Powerhouse is under construction in Highland with a recorded capacity of 1.1 MW.

1.1 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Small Hydro
Technology
Vento Ludens (formerly Hydroplan)
Highland
Authority
Scotland

Planning and build timeline

Application submitted2017-12-20
Permission granted2018-03-29
3 months after submission
Operationalnot recorded

Other built sites within 15 km

SiteMWDistance
Beinneun
Wind Onshore · Operational
857.4 km
Beinneun Windfarm Extension
Wind Onshore · Operational
23.87.4 km
Allt Ladaidh Hydro
Small Hydro · Operational
1.37.4 km
Allt Cheanna Mhuir Hydro
Small Hydro · Operational
1.39 km
Cia Aig Hydro
Small Hydro · Operational
310.2 km
Ceannacroc
Large Hydro · Operational
2013.9 km
Allt an t-Sidhein Hydro Scheme
Small Hydro · Under Construction
0.514.1 km
Ceannacroc
Small Hydro · Operational
1.614.4 km

How big is Allt Garaidh Ghualaich Hydro Scheme Powerhouse?

Allt Garaidh Ghualaich Hydro Scheme Powerhouse has a recorded installed capacity of 1.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Allt Garaidh Ghualaich Hydro Scheme Powerhouse?

REPD records the operator as Vento Ludens (formerly Hydroplan). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Allt Garaidh Ghualaich Hydro Scheme Powerhouse approved and built?

The application was submitted on 2017-12-20. Permission was granted on 2018-03-29, 3 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6545.