Novarly ParcelRenewable sites

Renewable sitesRay Valley Solar Farm

Ray Valley Solar Farm

Ray Valley Solar Farm is under construction in Cherwell with a recorded capacity of 19 MW.

19 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Low Carbon
Cherwell
Authority
England

Planning and build timeline

Application submitted2020-02-03
Permission granted2020-12-04
10 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Cherwell’s record on solar

Cherwell has decided 36 solar farms and approved 100%, taking a median of 2.4 months. See every solar farm decision in Cherwell

Other built sites within 15 km

SiteMWDistance
Ray Valley Solar Farm
Battery · Under Construction
0 km
Brooks Farm Solar Park
Solar Photovoltaics · Operational
80.4 km
Home Farm (Merton - solar)
Solar Photovoltaics · Operational
18.31.8 km
New Stone House
Solar Photovoltaics · Operational
12.54.2 km
Tesco Superstore Bicester
Solar Photovoltaics · Under Construction
0.64.9 km
Rowles Farm solar park
Solar Photovoltaics · Operational
136.8 km
Ardley EfW
EfW Incineration · Operational
247.8 km
Westcott Venture Park
Anaerobic Digestion · Operational
210.2 km

How big is Ray Valley Solar Farm?

Ray Valley Solar Farm has a recorded installed capacity of 19 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Ray Valley Solar Farm?

REPD records the operator as Low Carbon. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Ray Valley Solar Farm approved and built?

The application was submitted on 2020-02-03. Permission was granted on 2020-12-04, 10 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7497.