Bystock Solar Farm

Bystock Solar Farm is operational in East Devon with a recorded capacity of 4.1 MW, and has been generating since 2015-03-31.

4.1 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-03-31
Solar Photovoltaics
Technology
Lightsource Renewable Energy
East Devon
Authority
England

Planning and build timeline

Application submitted2014-07-03
Permission granted2014-09-30
3 months after submission
Operational2015-03-31
6 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

East Devon’s record on solar

East Devon has decided 31 solar farms and approved 87%, taking a median of 4.5 months. See every solar farm decision in East Devon

Other built sites within 15 km

SiteMWDistance
Coombe Farm
Solar Photovoltaics · Operational
81.4 km
Liverton Farm
Solar Photovoltaics · Operational
4.81.7 km
Hogsbrook Farm - Farm AD
Anaerobic Digestion · Operational
15.1 km
Enfield Farm
Anaerobic Digestion · Operational
27.9 km
Ford Oaks Solar & Green Infrastructure Facility
Solar Photovoltaics · Under Construction
309.7 km
Great Houndbeare Farm
Solar Photovoltaics · Operational
109.7 km
STRETE FARM SOLAR FARM
Solar Photovoltaics · Operational
4.811.1 km
Exeter EfW
EfW Incineration · Operational
1311.7 km

How big is Bystock Solar Farm?

Bystock Solar Farm has a recorded installed capacity of 4.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bystock Solar Farm?

REPD records the operator as Lightsource Renewable Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bystock Solar Farm approved and built?

The application was submitted on 2014-07-03. Permission was granted on 2014-09-30, 3 months later. The site became operational on 2015-03-31, 6 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2112.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council