Novarly ParcelRenewable sites

Renewable sitesBronwylfa Reservoir

Bronwylfa Reservoir

Bronwylfa Reservoir is an operational 3 MW solar farm in Wrexham, generating since 15 June 2015. Planning permission was granted on 18 July 2014, 3 months after submission. Operator of record: Wrexham County Borough Council.

3 MW
Capacity
as recorded in REPD
Operational
Status
since 15 June 2015
Solar Photovoltaics
Technology
Wrexham County Borough Council
Wrexham
Authority
Wales

Planning and build timeline

Application submitted11 April 2014
Permission granted18 July 2014
3 months after submission
Operational15 June 2015
11 months after consent

Screening a site of your own?

RedlineUK · £39

Wrexham approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Bronwylfa Reservoir’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Wrexham’s record on solar

Wrexham has decided 15 solar farms and approved 100%, taking a median of 5 months. See every solar farm decision in Wrexham

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
2.13.9 km
Solar Photovoltaics · Operational
5.44.8 km
Solar Photovoltaics · Operational
54.8 km
Solar Photovoltaics · Operational
55 km
Landfill Gas · Operational
2.37.2 km
Solar Photovoltaics · Operational
0.418.3 km
Solar Photovoltaics · Operational
3.69 km
Solar Photovoltaics · Operational
59.3 km

How big is Bronwylfa Reservoir?

Bronwylfa Reservoir has a recorded installed capacity of 3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bronwylfa Reservoir?

REPD records the operator as Wrexham County Borough Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bronwylfa Reservoir approved and built?

The application was submitted on 11 April 2014. Permission was granted on 18 July 2014, 3 months later. The site became operational on 15 June 2015, 11 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1520.