Renewable sites › F Lloyd Penley - Solar Panels
F Lloyd Penley - Solar Panels
F Lloyd Penley - Solar Panels is an operational 0.41 MW solar farm in Wrexham, generating since 1 August 2023. REPD does not record the planning grant date. Operator of record: F Lloyd Penley Ltd.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 1 August 2023 |
Screening a site of your own?
Wrexham approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with F Lloyd Penley - Solar Panels’s recorded coordinate — swap in your own postcode or coordinates.
Wrexham’s record on solar
Wrexham has decided 15 solar farms and approved 100%, taking a median of 5 months. See every solar farm decision in Wrexham →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 5 | 1 km |
Solar Photovoltaics · Operational | 3.6 | 1.2 km |
Solar Photovoltaics · Operational | 5.4 | 3.8 km |
Landfill Gas · Operational | 2.1 | 8.3 km |
Solar Photovoltaics · Operational | 3 | 8.3 km |
Solar Photovoltaics · Operational | 1 | 8.4 km |
Solar Photovoltaics · Operational | 5 | 9.7 km |
Solar Photovoltaics · Operational | 7.2 | 9.8 km |
How big is F Lloyd Penley - Solar Panels?
F Lloyd Penley - Solar Panels has a recorded installed capacity of 0.41 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates F Lloyd Penley - Solar Panels?
REPD records the operator as F Lloyd Penley Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was F Lloyd Penley - Solar Panels approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1 August 2023.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 14810.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode