Burntstalk Solar Park

Burntstalk Solar Park is operational in Breckland with a recorded capacity of 11.5 MW, and has been generating since 2013-03-30.

11.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2013-03-30
Solar Photovoltaics
Technology
Lightsource Renewable Energy
Breckland
Authority
England

Planning and build timeline

Application submitted2012-10-08
Permission granted2012-12-21
2 months after submission
Operational2013-03-30
3 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Breckland’s record on solar

Breckland has decided 27 solar farms and approved 93%, taking a median of 2.7 months. See every solar farm decision in Breckland

Other built sites within 15 km

SiteMWDistance
Swaffham 1 - Ecotech Wind Park
Wind Onshore · Operational
1.54.2 km
Swaffham Plashes II
Wind Onshore · Operational
1.85.3 km
Field north of Water Treatment Works / Hoggs Drove
Solar Photovoltaics · Operational
16.1 km
North Pickenham
Wind Onshore · Operational
14.48.6 km
North Pickenham Airfield
Wind Onshore · Operational
48.9 km
Blackborough End Landfill Site
Landfill Gas · Operational
1.510.9 km
Claypit Moor Solar Farm (Lexham)
Solar Photovoltaics · Operational
7.912.8 km
Reaches Farm Solar Park
Solar Photovoltaics · Operational
6.113.4 km

How big is Burntstalk Solar Park?

Burntstalk Solar Park has a recorded installed capacity of 11.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Burntstalk Solar Park?

REPD records the operator as Lightsource Renewable Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Burntstalk Solar Park approved and built?

The application was submitted on 2012-10-08. Permission was granted on 2012-12-21, 2 months later. The site became operational on 2013-03-30, 3 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1713.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council