Renewable sites › Field north of Water Treatment Works / Hoggs Drove
Field north of Water Treatment Works / Hoggs Drove
Field north of Water Treatment Works / Hoggs Drove is an operational 1 MW solar farm in King's Lynn and West Norfolk, generating since 1 July 2021. Planning permission was granted on 19 May 2021, 31 months after submission. Operator of record: Anglian Water Services.
Planning and build timeline
| Application submitted | 30 October 2018 |
| Permission granted | 19 May 2021 31 months after submission |
| Operational | 1 July 2021 1 months after consent |
Screening a site of your own?
King's Lynn and West Norfolk approves 97% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Field north of Water Treatment Works / Hoggs Drove’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
King's Lynn and West Norfolk’s record on solar
King's Lynn and West Norfolk has decided 31 solar farms and approved 97%, taking a median of 2.9 months. See every solar farm decision in King's Lynn and West Norfolk →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Landfill Gas · Operational | 1.5 | 5.8 km |
Solar Photovoltaics · Operational | 11.5 | 6.1 km |
Wind Onshore · Operational | 1.5 | 10 km |
Wind Onshore · Operational | 1.8 | 11.1 km |
Solar Photovoltaics · Operational | 1.2 | 11.2 km |
Solar Photovoltaics · Operational | 6.1 | 12.3 km |
Solar Photovoltaics · Operational | 4.8 | 12.7 km |
Wind Onshore · Operational | 14.4 | 13.9 km |
How big is Field north of Water Treatment Works / Hoggs Drove?
Field north of Water Treatment Works / Hoggs Drove has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Field north of Water Treatment Works / Hoggs Drove?
REPD records the operator as Anglian Water Services. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Field north of Water Treatment Works / Hoggs Drove approved and built?
The application was submitted on 30 October 2018. Permission was granted on 19 May 2021, 31 months later. The site became operational on 1 July 2021, 1 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6762.
Novarly Parcel · official public data, read properly · parcel.novarly.com