Renewable sites › Beavor - Photovoltaic Solar Arrays
Beavor - Photovoltaic Solar Arrays
Beavor - Photovoltaic Solar Arrays is under construction in East Devon with a recorded capacity of 18.9 MW.
Planning and build timeline
| Application submitted | 2021-11-17 |
| Permission granted | 2022-02-10 3 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Nutrient-neutrality catchment — River Axe SAC
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
East Devon’s record on solar
East Devon has decided 31 solar farms and approved 87%, taking a median of 4.5 months. See every solar farm decision in East Devon →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Newlands Farm (East Devon) Solar Photovoltaics · Operational | 5 | 0.6 km |
Wyld Meadow Solar Farm Solar Photovoltaics · Operational | 4.8 | 1.2 km |
Stonebarrow Farm Solar Photovoltaics · Operational | 8 | 2.2 km |
Beechgrove Farm Solar Photovoltaics · Operational | 4 | 2.6 km |
Axe View Solar Farm Solar Photovoltaics · Operational | 5 | 3.8 km |
Marshwood Farm Solar Photovoltaics · Operational | 1.8 | 7 km |
JB Wheaton Battery · Operational | 8.8 | 7.2 km |
Wambrook Farm Solar Photovoltaics · Operational | 4.1 | 11.1 km |
How big is Beavor - Photovoltaic Solar Arrays?
Beavor - Photovoltaic Solar Arrays has a recorded installed capacity of 18.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Beavor - Photovoltaic Solar Arrays?
REPD records the operator as Anesco Limited / Gresham House. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Beavor - Photovoltaic Solar Arrays approved and built?
The application was submitted on 2021-11-17. Permission was granted on 2022-02-10, 3 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 10040.
Novarly Parcel · official public data, read properly · parcel.novarly.com