Alness Academy is a 0.5 MW solar farm under construction in Highland. Planning permission was granted on 29 March 2019, 2 months after submission. Operator of record: Highland Council.

0.5 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Highland Council
Highland
Authority
Scotland

Planning and build timeline

Application submitted28 January 2019
Permission granted29 March 2019
2 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Highland approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Alness Academy’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Highland’s record on solar

Highland has decided 13 solar farms and approved 100%, taking a median of 2 months. See every solar farm decision in Highland

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
0.25 km
Biomass (dedicated) · Operational
55.6 km
Small Hydro · Operational
3.56.5 km
Wind Onshore · Operational
910.5 km
Wind Onshore · Operational
4.610.5 km
Wind Onshore · Operational
1710.6 km
Wind Onshore · Operational
36.810.6 km
Wind Onshore · Operational
29.911.1 km

How big is Alness Academy?

Alness Academy has a recorded installed capacity of 0.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Alness Academy?

REPD records the operator as Highland Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Alness Academy approved and built?

The application was submitted on 28 January 2019. Permission was granted on 29 March 2019, 2 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7274.