Alness Academy

Alness Academy is under construction in Highland with a recorded capacity of 0.5 MW.

0.5 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Highland Council
Highland
Authority
Scotland

Planning and build timeline

Application submitted2019-01-28
Permission granted2019-03-29
2 months after submission
Operationalnot recorded

Highland’s record on solar

Highland has decided 13 solar farms and approved 100%, taking a median of 2 months. See every solar farm decision in Highland

Other built sites within 15 km

SiteMWDistance
Invergordon Academy
Solar Photovoltaics · Operational
0.25 km
Invergordon Pellet Mill
Biomass (dedicated) · Operational
55.6 km
Black Rock
Small Hydro · Operational
3.56.5 km
Bendealt Wind Farm, Highland
Wind Onshore · Operational
910.5 km
Beinn Tharsuinn Extension (Beinn nan Oighrean)
Wind Onshore · Operational
4.610.5 km
Meall an Tuirc Wind Farm
Wind Onshore · Operational
1710.6 km
Novar Wind Farm (Extension)
Wind Onshore · Operational
36.810.6 km
Coire Na Cloiche Wind Farm
Wind Onshore · Operational
29.911.1 km

How big is Alness Academy?

Alness Academy has a recorded installed capacity of 0.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Alness Academy?

REPD records the operator as Highland Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Alness Academy approved and built?

The application was submitted on 2019-01-28. Permission was granted on 2019-03-29, 2 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7274.