Renewable sitesBeinn Tharsuinn Extension (Beinn nan Oighrean)

Beinn Tharsuinn Extension (Beinn nan Oighrean)

Beinn Tharsuinn Extension (Beinn nan Oighrean) is operational in Highland with a recorded capacity of 4.6 MW, and has been generating since 2009-07-01.

4.6 MW
Capacity
as recorded in REPD
Operational
Status
since 2009-07-01
Wind Onshore
Technology
Midefearn Renewables
Highland
Authority
Scotland

Planning and build timeline

Application submitted2007-01-19
Permission granted2008-12-11
23 months after submission
Operational2009-07-01
7 months after consent

Highland’s record on onshore wind

Highland has decided 99 onshore wind schemes and approved 63%, taking a median of 13.9 months. See every onshore wind scheme decision in Highland

Other built sites within 15 km

SiteMWDistance
Beinn Tharsuinn Windfarm Project
Wind Onshore · Operational
29.85.2 km
Coire Na Cloiche Wind Farm
Wind Onshore · Operational
29.97.7 km
Alness Academy
Solar Photovoltaics · Under Construction
0.510.5 km
Invergordon Pellet Mill
Biomass (dedicated) · Operational
510.6 km
Invergordon Academy
Solar Photovoltaics · Operational
0.211.7 km
Meall an Tuirc Wind Farm
Wind Onshore · Operational
1713.8 km
Novar Wind Farm (Extension)
Wind Onshore · Operational
36.813.8 km
Bendealt Wind Farm, Highland
Wind Onshore · Operational
914.1 km

How big is Beinn Tharsuinn Extension (Beinn nan Oighrean)?

Beinn Tharsuinn Extension (Beinn nan Oighrean) has a recorded installed capacity of 4.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Beinn Tharsuinn Extension (Beinn nan Oighrean)?

REPD records the operator as Midefearn Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Beinn Tharsuinn Extension (Beinn nan Oighrean) approved and built?

The application was submitted on 2007-01-19. Permission was granted on 2008-12-11, 23 months later. The site became operational on 2009-07-01, 7 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2991.