Renewable sites › Invergordon Academy
Invergordon Academy
Invergordon Academy is an operational 0.2 MW solar farm in Highland, generating since 1 November 2019. Planning permission was granted on 27 February 2019, 2 months after submission. Operator of record: Highland Council.
Planning and build timeline
| Application submitted | 11 January 2019 |
| Permission granted | 27 February 2019 2 months after submission |
| Operational | 1 November 2019 8 months after consent |
Screening a site of your own?
Highland approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Invergordon Academy’s recorded coordinate — swap in your own postcode or coordinates.
Highland’s record on solar
Highland has decided 13 solar farms and approved 100%, taking a median of 2 months. See every solar farm decision in Highland →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Biomass (dedicated) · Operational | 5 | 1.5 km |
Solar Photovoltaics · Under Construction | 0.5 | 5 km |
Small Hydro · Operational | 3.5 | 11.2 km |
Wind Onshore · Operational | 4.6 | 11.7 km |
Wind Onshore · Operational | 29.9 | 14.9 km |
How big is Invergordon Academy?
Invergordon Academy has a recorded installed capacity of 0.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Invergordon Academy?
REPD records the operator as Highland Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Invergordon Academy approved and built?
The application was submitted on 11 January 2019. Permission was granted on 27 February 2019, 2 months later. The site became operational on 1 November 2019, 8 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7310.