Witches Solar Farm is an operational 5 MW solar farm in Herefordshire, County of, generating since 19 February 2013. Planning permission was granted on 8 February 2011, 2 months after submission. Operator of record: Smarter Energy Solutions.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 19 February 2013
Solar Photovoltaics
Technology
Smarter Energy Solutions
Herefordshire, County of
Authority
England

Planning and build timeline

Application submitted29 November 2010
Permission granted8 February 2011
2 months after submission
Operational19 February 2013
24 months after consent

Screening a site of your own?

RedlineUK · £39

Herefordshire, County of approves 80% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Witches Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 1 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Herefordshire, County of’s record on solar

Herefordshire, County of has decided 25 solar farms and approved 80%, taking a median of 3 months. See every solar farm decision in Herefordshire, County of

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
18.2 km
Solar Photovoltaics · Operational
459.5 km
Battery · Operational
9.5 km
Battery · Operational
209.7 km
Solar Photovoltaics · Operational
4510.8 km
Solar Photovoltaics · Under Construction
112.5 km

How big is Witches Solar Farm?

Witches Solar Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Witches Solar Farm?

REPD records the operator as Smarter Energy Solutions. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Witches Solar Farm approved and built?

The application was submitted on 29 November 2010. Permission was granted on 8 February 2011, 2 months later. The site became operational on 19 February 2013, 24 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1699.

Novarly Parcel · official public data, read properly · parcel.novarly.com