Larport - Solar Farm
Larport - Solar Farm is operational in Herefordshire, County of with a recorded capacity of 45 MW, and has been generating since 2024-06-11.
Planning and build timeline
| Application submitted | 2021-10-01 |
| Permission granted | 2022-02-11 4 months after submission |
| Operational | 2024-06-11 28 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
- Nutrient-neutrality catchment — River Wye SAC (River Lugg SSSI)
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Herefordshire, County of’s record on solar
Herefordshire, County of has decided 25 solar farms and approved 80%, taking a median of 3 months. See every solar farm decision in Herefordshire, County of →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Land to the west of Clay Hill Pit / Larport Farm Battery · Operational | 20 | 1.4 km |
Larport, Clay Hill Pit - Solar Photovoltaics & Battery storage Solar Photovoltaics · Operational | 45 | 1.4 km |
Larport, Clay Hill Pit - Solar Photovoltaics & Battery storage Battery · Operational | — | 1.4 km |
Lower Venn Farm Solar Photovoltaics · Operational | 5 | 8.6 km |
Witches Solar Farm Solar Photovoltaics · Operational | 5 | 10.8 km |
Land at Green Farm Solar Photovoltaics · Operational | 1 | 11.1 km |
How big is Larport - Solar Farm?
Larport - Solar Farm has a recorded installed capacity of 45 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Larport - Solar Farm?
REPD records the operator as Conrad Energy (Developments) Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Larport - Solar Farm approved and built?
The application was submitted on 2021-10-01. Permission was granted on 2022-02-11, 4 months later. The site became operational on 2024-06-11, 28 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9247.