Novarly ParcelRenewable sites

Renewable sitesLarport, Clay Hill Pit - Solar Photovoltaics & Battery storage

Larport, Clay Hill Pit - Solar Photovoltaics & Battery storage

Larport, Clay Hill Pit - Solar Photovoltaics & Battery storage is an operational 45 MW solar farm in Herefordshire, County of, generating since 1 July 2024. Planning permission was granted on 27 May 2022, 7 months after submission. Operator of record: Conrad Energy.

45 MW
Capacity
as recorded in REPD
Operational
Status
since 1 July 2024
Solar Photovoltaics
Technology
Conrad Energy
Herefordshire, County of
Authority
England

Planning and build timeline

Application submitted25 October 2021
Permission granted27 May 2022
7 months after submission
Operational1 July 2024
25 months after consent

Screening a site of your own?

RedlineUK · £39

Herefordshire, County of approves 80% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Larport, Clay Hill Pit - Solar Photovoltaics & Battery storage’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Herefordshire, County of’s record on solar

Herefordshire, County of has decided 25 solar farms and approved 80%, taking a median of 3 months. See every solar farm decision in Herefordshire, County of

Other built sites within 15 km

SiteMWDistance
Battery · Operational
0 km
Battery · Operational
200.3 km
Solar Photovoltaics · Operational
451.4 km
Solar Photovoltaics · Operational
59.5 km
Solar Photovoltaics · Operational
59.9 km
Solar Photovoltaics · Operational
110.6 km

How big is Larport, Clay Hill Pit - Solar Photovoltaics & Battery storage?

Larport, Clay Hill Pit - Solar Photovoltaics & Battery storage has a recorded installed capacity of 45 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Larport, Clay Hill Pit - Solar Photovoltaics & Battery storage?

REPD records the operator as Conrad Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Larport, Clay Hill Pit - Solar Photovoltaics & Battery storage approved and built?

The application was submitted on 25 October 2021. Permission was granted on 27 May 2022, 7 months later. The site became operational on 1 July 2024, 25 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9962.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode