Novarly ParcelRenewable sites

Renewable sitesA J Lowther and Son Premise

A J Lowther and Son Premise

A J Lowther and Son Premise is a 1 MW solar farm under construction in Herefordshire, County of. Planning permission was granted on 16 October 2020, 14 months after submission. Operator of record: Private Developer.

1 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Private Developer
Herefordshire, County of
Authority
England

Planning and build timeline

Application submitted14 August 2019
Permission granted16 October 2020
14 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Herefordshire, County of approves 80% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with A J Lowther and Son Premise’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Herefordshire, County of’s record on solar

Herefordshire, County of has decided 25 solar farms and approved 80%, taking a median of 3 months. See every solar farm decision in Herefordshire, County of

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
3.49.1 km
Solar Photovoltaics · Operational
3.49.1 km
Solar Photovoltaics · Operational
1.410.9 km
Solar Photovoltaics · Operational
512.5 km

How big is A J Lowther and Son Premise?

A J Lowther and Son Premise has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates A J Lowther and Son Premise?

REPD records the operator as Private Developer. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was A J Lowther and Son Premise approved and built?

The application was submitted on 14 August 2019. Permission was granted on 16 October 2020, 14 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7508.