Windy Rig Wind Farm

Windy Rig Wind Farm is operational in Dumfries and Galloway with a recorded capacity of 43 MW, and has been generating since 2021-10-01.

43 MW
Capacity
as recorded in REPD
Operational
Status
since 2021-10-01
Wind Onshore
Technology
Statkraft UK
Dumfries and Galloway
Authority
Scotland

Planning and build timeline

Application submitted2019-06-11
Permission granted2019-11-08
5 months after submission
Operational2021-10-01
23 months after consent

Dumfries and Galloway’s record on onshore wind

Dumfries and Galloway has decided 55 onshore wind schemes and approved 67%, taking a median of 18.5 months. See every onshore wind scheme decision in Dumfries and Galloway

Other built sites within 15 km

SiteMWDistance
Brochloch Rig (formerly Windy Standard II)
Wind Onshore · Operational
902.5 km
Brochloch Rig 1 (formerly Windy Standard)
Wind Onshore · Operational
21.62.5 km
Windy Standard III Wind Farm (Brockloch Rig Phase 2)
Wind Onshore · Under Construction
87.64 km
Afton Wind Farm
Wind Onshore · Operational
504.1 km
Sanquhar 2 Community Wind Farm
Battery · Under Construction
7.7 km
Sanquhar 2 Community Wind Farm
Wind Onshore · Under Construction
3087.7 km
Benbrack Wind Farm
Wind Onshore · Operational
67.18.5 km
South Kyle Wind Farm
Wind Onshore · Operational
2408.7 km

How big is Windy Rig Wind Farm?

Windy Rig Wind Farm has a recorded installed capacity of 43 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Windy Rig Wind Farm?

REPD records the operator as Statkraft UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Windy Rig Wind Farm approved and built?

The application was submitted on 2019-06-11. Permission was granted on 2019-11-08, 5 months later. The site became operational on 2021-10-01, 23 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7562.