Renewable sitesBrochloch Rig 1 (formerly Windy Standard)

Brochloch Rig 1 (formerly Windy Standard)

Brochloch Rig 1 (formerly Windy Standard) is operational in Dumfries and Galloway with a recorded capacity of 21.6 MW, and has been generating since 1996-10-01.

21.6 MW
Capacity
as recorded in REPD
Operational
Status
since 1996-10-01
Wind Onshore
Technology
Fred Olsen Renewables
Dumfries and Galloway
Authority
Scotland

Planning and build timeline

Application submitted1995-07-24
Permission granted1996-03-07
7 months after submission
Operational1996-10-01
7 months after consent

Dumfries and Galloway’s record on onshore wind

Dumfries and Galloway has decided 55 onshore wind schemes and approved 67%, taking a median of 18.5 months. See every onshore wind scheme decision in Dumfries and Galloway

Other built sites within 15 km

SiteMWDistance
Brochloch Rig (formerly Windy Standard II)
Wind Onshore · Operational
901.4 km
Afton Wind Farm
Wind Onshore · Operational
501.7 km
Windy Rig Wind Farm
Wind Onshore · Operational
432.5 km
Windy Standard III Wind Farm (Brockloch Rig Phase 2)
Wind Onshore · Under Construction
87.64.4 km
Sanquhar 2 Community Wind Farm
Battery · Under Construction
7.1 km
Sanquhar 2 Community Wind Farm
Wind Onshore · Under Construction
3087.1 km
Enoch Hill
Wind Onshore · Under Construction
707.3 km
South Kyle Wind Farm
Wind Onshore · Operational
2407.4 km

How big is Brochloch Rig 1 (formerly Windy Standard)?

Brochloch Rig 1 (formerly Windy Standard) has a recorded installed capacity of 21.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Brochloch Rig 1 (formerly Windy Standard)?

REPD records the operator as Fred Olsen Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Brochloch Rig 1 (formerly Windy Standard) approved and built?

The application was submitted on 1995-07-24. Permission was granted on 1996-03-07, 7 months later. The site became operational on 1996-10-01, 7 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4527.