Renewable sites › Willsland Solar farm
Willsland Solar farm
Willsland Solar farm is an operational 3.2 MW solar farm in West Devon, generating since 21 March 2013. Planning permission was granted on 7 March 2012, 10 months after submission. Operator of record: The Green Company.
Planning and build timeline
| Application submitted | 18 May 2011 |
| Permission granted | 7 March 2012 10 months after submission |
| Operational | 21 March 2013 12 months after consent |
Screening a site of your own?
West Devon approves 83% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Willsland Solar farm’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 4 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
West Devon’s record on solar
West Devon has decided 12 solar farms and approved 83%, taking a median of 3.2 months. See every solar farm decision in West Devon →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 1.2 | 3.1 km |
Solar Photovoltaics · Operational | 1.3 | 3.8 km |
Wind Onshore · Operational | 7.5 | 9.2 km |
Solar Photovoltaics · Operational | 1.2 | 9.8 km |
Solar Photovoltaics · Operational | 5 | 11.6 km |
Solar Photovoltaics · Operational | 1 | 12.6 km |
Solar Photovoltaics · Operational | 5.2 | 13.3 km |
Solar Photovoltaics · Operational | 5 | 13.8 km |
How big is Willsland Solar farm?
Willsland Solar farm has a recorded installed capacity of 3.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Willsland Solar farm?
REPD records the operator as The Green Company. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Willsland Solar farm approved and built?
The application was submitted on 18 May 2011. Permission was granted on 7 March 2012, 10 months later. The site became operational on 21 March 2013, 12 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1341.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode