Hillsmoor Solar Farm
Hillsmoor Solar Farm is operational in West Devon with a recorded capacity of 1.2 MW, and has been generating since 2017-07-27.
Planning and build timeline
| Application submitted | 2014-06-27 |
| Permission granted | 2014-10-31 4 months after submission |
| Operational | 2017-07-27 33 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 4 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
West Devon’s record on solar
West Devon has decided 12 solar farms and approved 83%, taking a median of 3.2 months. See every solar farm decision in West Devon →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Willsland Solar farm Solar Photovoltaics · Operational | 3.2 | 3.1 km |
Crockers Hele Solar Photovoltaics · Operational | 1.3 | 3.5 km |
Dunsland Cross Wind Farm Wind Onshore · Operational | 7.5 | 12.2 km |
Southcombe Farm Solar Photovoltaics · Operational | 1.2 | 12.3 km |
Beaford Brook Solar Park Solar Photovoltaics · Operational | 5.2 | 12.7 km |
Foxcombe Farm Solar Park Solar Photovoltaics · Operational | 5 | 14.6 km |
Whiddon Farm Solar Photovoltaics · Operational | 1 | 15 km |
How big is Hillsmoor Solar Farm?
Hillsmoor Solar Farm has a recorded installed capacity of 1.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Hillsmoor Solar Farm?
REPD records the operator as Mosscliff Environmental. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Hillsmoor Solar Farm approved and built?
The application was submitted on 2014-06-27. Permission was granted on 2014-10-31, 4 months later. The site became operational on 2017-07-27, 33 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1884.