Salisbury Substation is under construction in Wiltshire with a recorded capacity of 49.5 MW.
Planning and build timeline
| Application submitted | 2019-08-05 |
| Permission granted | 2021-12-03 28 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Nutrient-neutrality catchment — River Avon SAC
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Wiltshire’s record on battery storage
Wiltshire has decided 30 battery storage schemes and approved 97%, taking a median of 13.9 months. See every battery storage scheme decision in Wiltshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Bake Farm Solar Farm Solar Photovoltaics · Operational | 5 | 4 km |
Boscombe Airfield Solar Photovoltaics · Operational | 12.3 | 11.1 km |
Whiteparish Landfill Gas · Operational | 1.1 | 13 km |
How big is Salisbury Substation?
Salisbury Substation has a recorded installed capacity of 49.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Salisbury Substation?
REPD records the operator as SSE Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Salisbury Substation approved and built?
The application was submitted on 2019-08-05. Permission was granted on 2021-12-03, 28 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7510.