Novarly ParcelRenewable sites

Renewable sitesWharrels Hill Wind Farm

Wharrels Hill Wind Farm

Wharrels Hill Wind Farm is an operational 10.4 MW onshore wind farm in Cumberland, generating since 7 August 2007. Planning permission was granted on 19 June 2002, 18 months after submission. Operator of record: Wharrels Hill Windfarm Ltd/ National Windpower.

10.4 MW
Capacity
as recorded in REPD
Operational
Status
since 7 August 2007
Wind Onshore
Technology
Wharrels Hill Windfarm Ltd/ National Windpower
Cumberland
Authority
England

Planning and build timeline

Application submitted23 December 2000
Permission granted19 June 2002
18 months after submission
Operational7 August 2007
62 months after consent

Screening a site of your own?

RedlineUK · £39

Cumberland approves 66% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Wharrels Hill Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Cumberland’s record on onshore wind

Cumberland has decided 38 onshore wind schemes and approved 66%, taking a median of 10.3 months. See every onshore wind scheme decision in Cumberland

Other built sites within 15 km

SiteMWDistance
Anaerobic Digestion · Operational
14.9 km
Anaerobic Digestion · Operational
55.3 km
Wind Onshore · Operational
125.8 km
Solar Photovoltaics · Operational
196.9 km
Solar Photovoltaics · Operational
0.87.5 km
Wind Onshore · Operational
6.27.8 km
Wind Onshore · Operational
3.99.1 km

How big is Wharrels Hill Wind Farm?

Wharrels Hill Wind Farm has a recorded installed capacity of 10.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Wharrels Hill Wind Farm?

REPD records the operator as Wharrels Hill Windfarm Ltd/ National Windpower. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Wharrels Hill Wind Farm approved and built?

The application was submitted on 23 December 2000. Permission was granted on 19 June 2002, 18 months later. The site became operational on 7 August 2007, 62 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2618.