Arkleby Mill is an operational 1 MW anaerobic digestion plant in Cumberland, generating since 1 February 2017. Planning permission was granted on 23 September 2015, 2 months after submission. Operator of record: Mssrs R Miller Ltd.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 1 February 2017
Anaerobic Digestion
Technology
Mssrs R Miller Ltd
Cumberland
Authority
England

Planning and build timeline

Application submitted29 July 2015
Permission granted23 September 2015
2 months after submission
Operational1 February 2017
16 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Cumberland: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Arkleby Mill’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Anaerobic Digestion · Operational
50.8 km
Solar Photovoltaics · Operational
193.1 km
Wind Onshore · Operational
6.23.3 km
Wind Onshore · Operational
10.44.9 km
Wind Onshore · Operational
125.2 km
Solar Photovoltaics · Operational
0.86.2 km
Wind Onshore · Operational
3.910.1 km
Wind Onshore · Operational
9.211.4 km

How big is Arkleby Mill?

Arkleby Mill has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Arkleby Mill?

REPD records the operator as Mssrs R Miller Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Arkleby Mill approved and built?

The application was submitted on 29 July 2015. Permission was granted on 23 September 2015, 2 months later. The site became operational on 1 February 2017, 16 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5645.