Renewable sites › Westmill Farm - PV
Westmill Farm - PV
Westmill Farm - PV is an operational 5 MW solar farm in Vale of White Horse, generating since 19 July 2011. Planning permission was granted on 28 March 2011, 3 months after submission. Operator of record: Private Developer.
Planning and build timeline
| Application submitted | 4 January 2011 |
| Permission granted | 28 March 2011 3 months after submission |
| Operational | 19 July 2011 4 months after consent |
Screening a site of your own?
Vale of White Horse approves 91% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Westmill Farm - PV’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Vale of White Horse’s record on solar
Vale of White Horse has decided 23 solar farms and approved 91%, taking a median of 3 months. See every solar farm decision in Vale of White Horse →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 6.5 | 1.6 km |
Solar Photovoltaics · Operational | 12.7 | 4.4 km |
Solar Photovoltaics · Operational | 9.3 | 5.8 km |
Solar Photovoltaics · Operational | 27 | 6.2 km |
Solar Photovoltaics · Under Construction | 49.9 | 6.5 km |
Battery · Under Construction | — | 6.5 km |
Solar Photovoltaics · Operational | 4.6 | 6.6 km |
Solar Photovoltaics · Operational | 19 | 7.1 km |
How big is Westmill Farm - PV?
Westmill Farm - PV has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Westmill Farm - PV?
REPD records the operator as Private Developer. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Westmill Farm - PV approved and built?
The application was submitted on 4 January 2011. Permission was granted on 28 March 2011, 3 months later. The site became operational on 19 July 2011, 4 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1054.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode