Solar planning in Vale of White Horse

Vale of White Horse has decided 23 solar farms and approved 91% of them, taking a median of 3 months to decide. Consented capacity: 212 MW. 6 applications still awaiting a decision.

91%
Approved
21 granted · 2 refused
3 mo
Median decision
UK 2.3 mo
212 MW
Consented
70 MW refused
3
Appeals
1 allowed on appeal

How Vale of White Horse compares

Against the 298 UK authorities with 5+ solar decisions, Vale of White Horse sits in the 27th percentile for approval rate (2 points below the England average) and the 32nd percentile for speed.

Decisions by year

35Approved — 1 (2011)111Approved — 2 (2012)212Approved — 3 (2013)313Approved — 1 (2014)114Refused — 1 (2015)115Approved — 3 (2021)321Approved — 4 (2023)423Approved — 3 (2024)324Approved — 4 (2025)Refused — 1 (2025)525
Approved Refused

Solar decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (35)

SchemeMWStatusDecided
Botley - Solar Photovoltaic Array
Red House Solar Limited · P24/V2489/FUL · 10.8 mo to decide
49.99Application Refused2025-11-06
Snowswick Lane, Coleshill - Solar Farm
Abei Energy Limited · P25/V1646/FUL
39.6Application Submitted2025-08-20
Macdermid Autotype, Grove Road - Solar Panels
MacDermid Autotype Limited · P25/V1058/FUL · 2.1 mo to decide
0.36Awaiting Construction2025-07-15
Brook Drive, Milton Park - Solar Panels
LTi-Metaltech · P25/V0619/N8A · 1.8 mo to decide
Awaiting Construction2025-06-26
Manor Farm, Denchworth - Solar Photovoltaic Panels
Renewable Connections Limited · P23/V2673/FUL · 16.2 mo to decide
30Awaiting Construction2025-04-03
Milton Park, Milton - Solar Panels
Crowcon Detection Instruments Limited · P25/V0245/N8A · 1.7 mo to decide
0.3Awaiting Construction2025-03-28
Willowfields Energy Park, Marcham - Solar Panels
Exagen Development Limited · P24/V2698/FUL
49.9Application Submitted2024-12-18
Harwell Science And Innovation Campus -Solar Panels
MRC Harwell Institute · P24/V1968/N8A · 2.5 mo to decide
0.59Awaiting Construction2024-12-02
Hachette UK Distribution Centre, Milton Road - Solar Panels
Tritax Acquisition 37 Limited · P24/V2079/N8A · 1.8 mo to decide
0.87Awaiting Construction2024-11-18
Botley - Solar Photovoltaic Array
Red House Solar Limited · P23/V2624/FUL
49.99Revised2024-07-19
Barnstaples Farm
Nextpower SPV 14 Limited · P21/V3395/FUL · 26.8 mo to decide
49.9Awaiting Construction2024-02-28
Blacklands Way - Solar Panels
Abbott Toxicology · P23/V1262/FUL · 1.4 mo to decide
0.21Awaiting Construction2023-08-23
Radley College, Kennington Gate - Solar Array & Battery Storage
Radley College · P23/V0861/FUL · 4 mo to decide
2Awaiting Construction2023-08-10
Millets Farm Centre, Kingston Road - Solar Array
Reduce Limited · P22/V2186/FUL · 4.3 mo to decide
0.8Awaiting Construction2023-01-26
Rebellion Film Studios, Milton Road - Solar Panels
Rebellion Limited · P22/V2709/N8A · 1.8 mo to decide
0.88Awaiting Construction2023-01-06
Rutherford Appleton Laboratory, Building R8 & R9, Harwell - Solar Panels
Science & Technology Facilities Council · P22/V0822/N8A
0.26Application Withdrawn2022-07-01
Rutherford Appleton Laboratory, Building R1, Harwell - Solar Panels
Science and Technology Facilities Council · P22/V0823/N8A
0.42Application Withdrawn2022-07-01
Rutherford Appleton Laboratory, Building R40, Harwell - Solar Panels
Science and Technology Facilities Council · P22/V0820/N8A
0.2Application Withdrawn2022-07-01
Rutherford Appleton Laboratory, Buildings R25, R61 & R68, Harwell - Solar Panels
Science & Technology Facilities Council · P22/V0826/N8A
0.19Application Withdrawn2022-05-19
Rutherford Appleton Laboratory, Building R105 & R106, Harwell - Solar Panel
Science and Technology Facilities Council · P22/V0819/N8A
0.58Application Withdrawn2022-05-19
South Car Park - Solar photovoltaic carport system
Science and Technology Facilities Council · P21/V0429/FUL · 7.9 mo to decide
Operational2021-09-17
Rutherford Appleton Laboratory
The Science and Technology Facilities Council · P21/V0971/FUL · 2.2 mo to decide
1.6Awaiting Construction2021-07-13
Appleford Sidings, Sutton Courtenay - Solar Photovoltaic Array
Infinis Solar Developments Limited · MW.0069/21
24Application Submitted2021-05-19
Avon Road Car Park - Solar Photovoltaic Carport System
Science and Technology Facilities Council · P21/V0430/FUL · 3.3 mo to decide
1.62Operational2021-04-30
Chadwicks Farm
Kronos Solar · P15/V0169/FUL · 3 mo to decide
20Appeal Refused2015-04-29
Elms Farm
Bluefield Solar · P14/V1135/FUL · 3 mo to decide
29Operational2014-08-28
Reading Road
Orta East Hendred Solar Ltd · P14/V0839/FUL
25Application Withdrawn2014-06-26
Chadwicks Farms
Kronos Solar · P14/V0552/FUL · 3 mo to decide
30Revised2014-06-25
Reading Road
Orta East Hendred Solar Ltd · P13/V2544/FUL · 3 mo to decide
25Revised2014-02-26
Goose Willow Farm - extension
Ikaros Solar Limited · P13/V1975/FUL · 3.4 mo to decide
7Operational2013-12-23
Landmead Farm (East Hanney)
First Solar/Innogy (previously BELECTRIC Solar)/Foresight Solar Fund · P13/V1664/FUL · 3.3 mo to decide
46Operational2013-10-29
Hill Farm Solar Park (VoWH)
Hill Farm Solar Park Limited · P13/V1478/FUL · 2.7 mo to decide
14.8Operational2013-10-01
Goose Willow Farm
IKAROS SOLAR LIMITED · P12/V2112/FUL · 1.8 mo to decide
11.5Operational2012-12-11
Steventon Solar Park
Foresight · P12/V1571/FUL · 3 mo to decide
10Operational2012-10-17
Westmill Farm - PV
Private Developer · 11/00077/FUL · 2.7 mo to decide
5Operational2011-03-28

Does Vale of White Horse approve solar farms?

Yes — of the 23 solar farms Vale of White Horse has decided, 91% were approved (21 granted, 2 refused). The UK-wide rate for solar is 93%.

How long does a solar farm application take in Vale of White Horse?

The median time from application to decision is 3 months, against a UK median of 2.3 months for solar. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much solar capacity has Vale of White Horse consented?

212 MW has been consented across 21 approved schemes, with 70 MW refused. A further 6 applications awaits a decision.

Other technologies in Vale of White Horse

Battery storage in Vale of White HorseOnshore wind in Vale of White Horse

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.