Renewable sitesWestbury Landfill Scheme

Westbury Landfill Scheme

Westbury Landfill Scheme is operational in Wiltshire with a recorded capacity of 1.1 MW, and has been generating since 1998-07-15.

1.1 MW
Capacity
as recorded in REPD
Operational
Status
since 1998-07-15
Landfill Gas
Technology
Haul Waste Disposal Ltd
Wiltshire
Authority
England

Planning and build timeline

Application submitted1997-03-03
Permission granted1997-07-25
5 months after submission
Operational1998-07-15
12 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Westbury (Closed) Landfill Site
Solar Photovoltaics · Operational
3.50.7 km
Blenches Mill
Solar Photovoltaics · Operational
6.11.4 km
Brook Hall Farm
Solar Photovoltaics · Operational
4.73.2 km
Land West Side of Axe and Cleaver Lane
Solar Photovoltaics · Operational
53.6 km
Land at Poles Hole Farm
Solar Photovoltaics · Operational
6.84.7 km
Land north of Ashton Road
Solar Photovoltaics · Operational
45.6 km
Trowbridge Sewage Treatment Works
Sewage Sludge Digestion · Operational
1.27 km
Stokes Marsh Farm
Solar Photovoltaics · Operational
16.67.2 km

How big is Westbury Landfill Scheme?

Westbury Landfill Scheme has a recorded installed capacity of 1.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Westbury Landfill Scheme?

REPD records the operator as Haul Waste Disposal Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Westbury Landfill Scheme approved and built?

The application was submitted on 1997-03-03. Permission was granted on 1997-07-25, 5 months later. The site became operational on 1998-07-15, 12 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 598.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council