Toyota Solar Farm is operational in South Derbyshire with a recorded capacity of 4.6 MW, and has been generating since 2011-07-25.

4.6 MW
Capacity
as recorded in REPD
Operational
Status
since 2011-07-25
Solar Photovoltaics
Technology
Bluefield Solar Income Fund
South Derbyshire
Authority
England

Planning and build timeline

Application submitted2011-03-11
Permission granted2011-04-11
1 months after submission
Operational2011-07-25
3 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

South Derbyshire’s record on solar

South Derbyshire has decided 12 solar farms and approved 67%, taking a median of 4.9 months. See every solar farm decision in South Derbyshire

Other built sites within 15 km

SiteMWDistance
Sinfin Lane
Advanced Conversion Technologies · Operational
7.56.6 km
Rolleston Park Farm
Solar Photovoltaics · Operational
18.78.5 km
Hawthorn Farm - Solar photovoltaic panels
Solar Photovoltaics · Under Construction
109.1 km
Bretby Power
Landfill Gas · Operational
1.610.1 km
Aston House Solar Farm
Solar Photovoltaics · Operational
2011.3 km
Derby Sewage Treatment Works
Wind Onshore · Operational
511.4 km
Short Hazel Solar Farm
Solar Photovoltaics · Operational
512.1 km
Midland Lead, Kiln Way - Solar Photovoltaic Panels
Solar Photovoltaics · Operational
0.2412.3 km

How big is Toyota Solar Farm?

Toyota Solar Farm has a recorded installed capacity of 4.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Toyota Solar Farm?

REPD records the operator as Bluefield Solar Income Fund. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Toyota Solar Farm approved and built?

The application was submitted on 2011-03-11. Permission was granted on 2011-04-11, 1 months later. The site became operational on 2011-07-25, 3 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1048.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council