Novarly ParcelRenewable sites

Renewable sitesAston House Solar Farm

Aston House Solar Farm

Aston House Solar Farm is operational in Derbyshire Dales with a recorded capacity of 20 MW, and has been generating since 2015-03-27.

20 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-03-27
Solar Photovoltaics
Technology
Solar century / Magnetar Solar
Derbyshire Dales
Authority
England

Planning and build timeline

Application submitted2014-07-07
Permission granted2014-11-17
4 months after submission
Operational2015-03-27
4 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Derbyshire Dales’s record on solar

Derbyshire Dales has decided 13 solar farms and approved 92%, taking a median of 2.9 months. See every solar farm decision in Derbyshire Dales

Other built sites within 15 km

SiteMWDistance
Morton House (Marchington)
Solar Photovoltaics · Operational
6.22.4 km
Land of Green Lane
Solar Photovoltaics · Operational
5.82.6 km
Hawthorn Farm - Solar photovoltaic panels
Solar Photovoltaics · Under Construction
102.8 km
Holtwood Farm
Solar Photovoltaics · Operational
54.4 km
Somersal Mill Farm
Solar Photovoltaics · Operational
2.65.2 km
Marchington Solar Farm
Solar Photovoltaics · Operational
4.36 km
Rolleston Park Farm
Solar Photovoltaics · Operational
18.76.1 km
Solar farm at land at The Willows, Uttoxeter
Solar Photovoltaics · Operational
6.46.7 km

How big is Aston House Solar Farm?

Aston House Solar Farm has a recorded installed capacity of 20 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Aston House Solar Farm?

REPD records the operator as Solar century / Magnetar Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Aston House Solar Farm approved and built?

The application was submitted on 2014-07-07. Permission was granted on 2014-11-17, 4 months later. The site became operational on 2015-03-27, 4 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1955.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council