Renewable sites › The Grange
The Grange
The Grange is an operational 8 MW solar farm in North Somerset, generating since 30 March 2016. Planning permission was granted on 3 February 2015, 5 months after submission. Operator of record: Elgin Energy EsCo.
Planning and build timeline
| Application submitted | 8 September 2014 |
| Permission granted | 3 February 2015 5 months after submission |
| Operational | 30 March 2016 14 months after consent |
Screening a site of your own?
North Somerset approves 95% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with The Grange’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
North Somerset’s record on solar
North Somerset has decided 39 solar farms and approved 95%, taking a median of 2.9 months. See every solar farm decision in North Somerset →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Under Construction | 19.8 | 2.4 km |
Solar Photovoltaics · Operational | 8.3 | 3.2 km |
Solar Photovoltaics · Under Construction | 0.84 | 3.4 km |
Solar Photovoltaics · Under Construction | 2.93 | 3.5 km |
Solar Photovoltaics · Operational | 7.1 | 4.3 km |
Solar Photovoltaics · Operational | 7.2 | 4.8 km |
Solar Photovoltaics · Operational | 1 | 5.8 km |
Solar Photovoltaics · Operational | 8 | 6.1 km |
How big is The Grange?
The Grange has a recorded installed capacity of 8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates The Grange?
REPD records the operator as Elgin Energy EsCo. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was The Grange approved and built?
The application was submitted on 8 September 2014. Permission was granted on 3 February 2015, 5 months later. The site became operational on 30 March 2016, 14 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4856.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode