Bowerhouse Farm (extension)

Bowerhouse Farm (extension) is a 19.8 MW solar farm under construction in North Somerset. Planning permission was granted on 25 March 2022, 24 months after submission. Operator of record: Ethical Power.

19.8 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Ethical Power
North Somerset
Authority
England

Planning and build timeline

Application submitted31 March 2020
Permission granted25 March 2022
24 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

North Somerset approves 95% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Bowerhouse Farm (extension)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North Somerset’s record on solar

North Somerset has decided 39 solar farms and approved 95%, taking a median of 2.9 months. See every solar farm decision in North Somerset

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
8.30.9 km
Solar Photovoltaics · Operational
7.22.4 km
Solar Photovoltaics · Operational
7.12.4 km
Solar Photovoltaics · Operational
82.4 km
Solar Photovoltaics · Operational
14.4 km
Solar Photovoltaics · Under Construction
0.844.5 km
Solar Photovoltaics · Under Construction
2.934.6 km
Solar Photovoltaics · Operational
84.8 km

How big is Bowerhouse Farm (extension)?

Bowerhouse Farm (extension) has a recorded installed capacity of 19.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bowerhouse Farm (extension)?

REPD records the operator as Ethical Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bowerhouse Farm (extension) approved and built?

The application was submitted on 31 March 2020. Permission was granted on 25 March 2022, 24 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7539.