Renewable sites › Symmetry Park Energy Centre
Symmetry Park Energy Centre
Symmetry Park Energy Centre is a battery storage site under construction in Rugby. Planning permission was granted on 29 October 2021, 3 months after submission. Operator of record: Tritax Symmetry.
Planning and build timeline
| Application submitted | 4 August 2021 |
| Permission granted | 29 October 2021 3 months after submission |
| Operational | not recorded |
Screening a site of your own?
Rugby approves 100% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Symmetry Park Energy Centre’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Rugby’s record on battery storage
Rugby has decided 5 battery storage schemes and approved 100%, taking a median of 9.8 months. See every battery storage scheme decision in Rugby →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Landfill Gas · Operational | 3 | 1.8 km |
Solar Photovoltaics · Operational | 7 | 2.5 km |
Landfill Gas · Operational | 2.4 | 10.4 km |
Landfill Gas · Operational | 1 | 10.6 km |
Wind Onshore · Operational | 4 | 11 km |
Landfill Gas · Operational | 2.3 | 11.5 km |
Solar Photovoltaics · Operational | 18.3 | 11.7 km |
Wind Onshore · Operational | 10 | 11.8 km |
How big is Symmetry Park Energy Centre?
REPD does not record an installed capacity for Symmetry Park Energy Centre.
Who operates Symmetry Park Energy Centre?
REPD records the operator as Tritax Symmetry. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Symmetry Park Energy Centre approved and built?
The application was submitted on 4 August 2021. Permission was granted on 29 October 2021, 3 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9448.