Renewable sitesDengemarsh Road

Dengemarsh Road

Dengemarsh Road is an operational 1 MW solar farm in Folkestone and Hythe, generating since 14 December 2016. Planning permission was granted on 13 April 2017, 2 months after submission. Operator of record: Tudor Roof Tile Co.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 14 December 2016
Solar Photovoltaics
Technology
Tudor Roof Tile Co
Folkestone and Hythe
Authority
England

Planning and build timeline

Application submitted21 February 2017
Permission granted13 April 2017
2 months after submission
Operational14 December 2016

Screening a site of your own?

RedlineUK · £39

Folkestone and Hythe approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Dengemarsh Road’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Folkestone and Hythe’s record on solar

Folkestone and Hythe has decided 8 solar farms and approved 100%, taking a median of 2.5 months. See every solar farm decision in Folkestone and Hythe

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
206.8 km
Wind Onshore · Operational
59.86.9 km

How big is Dengemarsh Road?

Dengemarsh Road has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Dengemarsh Road?

REPD records the operator as Tudor Roof Tile Co. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Dengemarsh Road approved and built?

The application was submitted on 21 February 2017. Permission was granted on 13 April 2017, 2 months later. The site became operational on 14 December 2016.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6376.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode