Dengemarsh Road

Dengemarsh Road is operational in Folkestone and Hythe with a recorded capacity of 1 MW, and has been generating since 2016-12-14.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-12-14
Solar Photovoltaics
Technology
Tudor Roof Tile Co
Folkestone and Hythe
Authority
England

Planning and build timeline

Application submitted2017-02-21
Permission granted2017-04-13
2 months after submission
Operational2016-12-14

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Folkestone and Hythe’s record on solar

Folkestone and Hythe has decided 8 solar farms and approved 100%, taking a median of 2.5 months. See every solar farm decision in Folkestone and Hythe

Other built sites within 15 km

SiteMWDistance
Sycamore Farm
Solar Photovoltaics · Operational
206.8 km
Little Cheyne Court Wind Farm
Wind Onshore · Operational
59.86.9 km

How big is Dengemarsh Road?

Dengemarsh Road has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Dengemarsh Road?

REPD records the operator as Tudor Roof Tile Co. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Dengemarsh Road approved and built?

The application was submitted on 2017-02-21. Permission was granted on 2017-04-13, 2 months later. The site became operational on 2016-12-14.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6376.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council