Dengemarsh Road is operational in Folkestone and Hythe with a recorded capacity of 1 MW, and has been generating since 2016-12-14.
Planning and build timeline
| Application submitted | 2017-02-21 |
| Permission granted | 2017-04-13 2 months after submission |
| Operational | 2016-12-14 |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 4 agricultural land.
- Ramsar wetland — Dungeness, Romney Marsh and Rye Bay
- SSSI — Dungeness, Romney Marsh and Rye Bay SSSI
- Special Protection Area — Dungeness, Romney Marsh and Rye Bay
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Folkestone and Hythe’s record on solar
Folkestone and Hythe has decided 8 solar farms and approved 100%, taking a median of 2.5 months. See every solar farm decision in Folkestone and Hythe →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Sycamore Farm Solar Photovoltaics · Operational | 20 | 6.8 km |
Little Cheyne Court Wind Farm Wind Onshore · Operational | 59.8 | 6.9 km |
How big is Dengemarsh Road?
Dengemarsh Road has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Dengemarsh Road?
REPD records the operator as Tudor Roof Tile Co. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Dengemarsh Road approved and built?
The application was submitted on 2017-02-21. Permission was granted on 2017-04-13, 2 months later. The site became operational on 2016-12-14.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6376.