Sunnyside wind cluster is operational in Dumfries and Galloway with a recorded capacity of 1 MW, and has been generating since 2015-11-15.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-11-15
Wind Onshore
Technology
Sunnyside Wind Farm
Dumfries and Galloway
Authority
Scotland

Planning and build timeline

Application submitted2013-04-05
Permission granted2013-12-19
8 months after submission
Operational2015-11-15
23 months after consent

Dumfries and Galloway’s record on onshore wind

Dumfries and Galloway has decided 55 onshore wind schemes and approved 67%, taking a median of 18.5 months. See every onshore wind scheme decision in Dumfries and Galloway

Other built sites within 15 km

SiteMWDistance
Whiteside Hill
Wind Onshore · Operational
25.35.6 km
Sandy Knowe Wind Farm
Wind Onshore · Operational
81.66.5 km
Twentyshilling Hill Wind Farm
Wind Onshore · Under Construction
37.87.3 km
Sanquhar Community Windfarm
Wind Onshore · Operational
32.47.3 km
Sanquhar 2 Community Wind Farm
Battery · Under Construction
11.1 km
Sanquhar 2 Community Wind Farm
Wind Onshore · Under Construction
30811.1 km
Hare Hill (East Ayrshire)
Wind Onshore · Operational
13.211.4 km
Hare Hill Extension
Wind Onshore · Operational
29.811.4 km

How big is Sunnyside wind cluster?

Sunnyside wind cluster has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Sunnyside wind cluster?

REPD records the operator as Sunnyside Wind Farm. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Sunnyside wind cluster approved and built?

The application was submitted on 2013-04-05. Permission was granted on 2013-12-19, 8 months later. The site became operational on 2015-11-15, 23 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4514.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council