Renewable sites › Sandy Knowe Wind Farm
Sandy Knowe Wind Farm
Sandy Knowe Wind Farm is an operational 81.6 MW onshore wind farm in Scotland, generating since 18 February 2023. REPD does not record the planning grant date. Operator of record: ERG.
Planning and build timeline
| Application submitted | 16 August 2018 |
| Permission granted | not recorded |
| Operational | 18 February 2023 |
Screening a site of your own?
Redline runs the same record on your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Sandy Knowe Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.
Scottish Government (S36)’s record on onshore wind
Scottish Government (S36) has decided 173 onshore wind schemes and approved 80%, taking a median of 33.7 months. See every onshore wind scheme decision in Scottish Government (S36) →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 25.3 | 2.1 km |
Wind Onshore · Operational | 32.4 | 3.1 km |
Wind Onshore · Operational | 13.2 | 4.9 km |
Wind Onshore · Operational | 29.8 | 4.9 km |
Wind Onshore · Operational | 1 | 6.5 km |
Wind Onshore · Under Construction | 308 | 7.3 km |
Battery · Under Construction | — | 7.3 km |
Wind Onshore · Operational | 50 | 10.3 km |
How big is Sandy Knowe Wind Farm?
Sandy Knowe Wind Farm has a recorded installed capacity of 81.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Sandy Knowe Wind Farm?
REPD records the operator as ERG. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Sandy Knowe Wind Farm approved and built?
The application was submitted on 16 August 2018. REPD does not record a grant date. The site became operational on 18 February 2023.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6703.