Novarly ParcelRenewable sites

Renewable sitesSpalding

Spalding

Spalding is operational in South Holland with a recorded capacity of 14.5 MW, and has been generating since 2015-07-08.

14.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-07-08
Biomass (dedicated)
Technology
SPEP
South Holland
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational2015-07-08

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Deeping St Nicholas Wind Farm
Wind Onshore · Operational
16.47.1 km
Decoy Farm
Solar Photovoltaics · Operational
58.4 km
Decoy Farm (Farm AD)
Anaerobic Digestion · Operational
1.88.5 km
Limes Farm Solar Farm
Solar Photovoltaics · Operational
4.611.8 km
French Farm
Wind Onshore · Operational
412.5 km
Grange Farm (Lincolnshire)
Solar Photovoltaics · Operational
12.713.5 km

How big is Spalding?

Spalding has a recorded installed capacity of 14.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Spalding?

REPD records the operator as SPEP. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Spalding approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2015-07-08.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6165.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council