Renewable sitesSouber Dairy, Bank Newton - Solar Panels

Souber Dairy, Bank Newton - Solar Panels

Souber Dairy, Bank Newton - Solar Panels is operational in North Yorkshire with a recorded capacity of 0.19 MW, and has been generating since 2022-10-31.

0.19 MW
Capacity
as recorded in REPD
Operational
Status
since 2022-10-31
Solar Photovoltaics
Technology
Dodgson Farms Limited
North Yorkshire
Authority
England

Planning and build timeline

Application submitted2023-03-07
Permission grantednot recorded
Operational2022-10-31

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North Yorkshire’s record on solar

North Yorkshire has decided 105 solar farms and approved 96%, taking a median of 2.7 months. See every solar farm decision in North Yorkshire

Other built sites within 15 km

SiteMWDistance
Land of coal pit lane
Solar Photovoltaics · Operational
59.6 km
Skibeden
Landfill Gas · Operational
210.2 km
Chelker Reservoir (Retention of Turbines)
Wind Onshore · Operational
1.214.7 km
Chelker Reservoir
Wind Onshore · Operational
1.314.7 km

How big is Souber Dairy, Bank Newton - Solar Panels?

Souber Dairy, Bank Newton - Solar Panels has a recorded installed capacity of 0.19 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Souber Dairy, Bank Newton - Solar Panels?

REPD records the operator as Dodgson Farms Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Souber Dairy, Bank Newton - Solar Panels approved and built?

The application was submitted on 2023-03-07. REPD does not record a grant date. The site became operational on 2022-10-31.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 13443.