Skibeden

Skibeden is operational in North Yorkshire with a recorded capacity of 2 MW, and has been generating since 2009-05-17.

2 MW
Capacity
as recorded in REPD
Operational
Status
since 2009-05-17
Landfill Gas
Technology
Yorwaste
North Yorkshire
Authority
England

Planning and build timeline

Application submitted2001-12-01
Permission granted2002-05-07
5 months after submission
Operational2009-05-17
84 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Chelker Reservoir (Retention of Turbines)
Wind Onshore · Operational
1.24.5 km
Chelker Reservoir
Wind Onshore · Operational
1.34.5 km
Souber Dairy, Bank Newton - Solar Panels
Solar Photovoltaics · Operational
0.1910.2 km

How big is Skibeden?

Skibeden has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Skibeden?

REPD records the operator as Yorwaste. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Skibeden approved and built?

The application was submitted on 2001-12-01. Permission was granted on 2002-05-07, 5 months later. The site became operational on 2009-05-17, 84 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 652.